References

Saarlouis | August 2018

Heavy goods traffic in Saarlouis – Extension of the roadway in the meadow at the motorway exit – To protect the trucks with wind turbine parts from sinking – Laying the road plate Professional over a length of 15 m.

Puettlingen | September 2018

Construction site in Puettlingen near Saarbruecken – Creation of an access for lorries to a pit shaft which will be filled – To protect the underground from damage – Laying the road plate Performance on a straight roadway and the structured plastic plates on gradients over a total length of 3200 m.

Fahrplatten - Referenzen Püttlingen September 2018

Freising | March 2019

5-year construction site in Freising near Munich – Creation of a passable area for all truck and construction machinery traffic – To protect against getting stuck and ground water pollution in case of oil leakage – Laying of the heavy duty plates Maximum on an area of approx. 500 sqm.

Referenzen Freising März 2019

Durlach | April 2019

Construction site in Durlach near Karlsruhe – Creation of an access road for trucks up to 40 tons and construction machinery – To avoid soil compaction to protect the habitat of lizards – Laying the soil protection plates Save over a length of 125 m.

Referenzen Durlach April 2019

Saarlouis | July 2019

Extension of several escalators in a department store in Saarlouis– Creation of a drivable area for forklift trucks – To protect the underground from damage – Laying of the road plate Performance indoors and outdoors on a total area of approx. 130 sqm.

Referenzen Saarlouis Juli 2019